Scaffold Inspection Record
Keep a dated inspection history for one scaffold, with findings and the action taken recorded beside each inspection.
Trade job forms · TJ-33
A free printable scaffold handover form — what was erected and who received it, every alteration during the hire, and the off-hire call and materials count.
One page. Choose your paper size — both versions are laid out identically, so neither one gets shrunk to fit.
Print it and write on it
Fill it in type and save
The fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.
Settle the questions a scaffold hire always raises — who asked for the extra lift, when off-hire was called and what went missing — from a signed record rather than a phone call.
Scaffolding contractors, and the site managers and builders who hire from them.
One page, top to bottom:
Printed under the title: One scaffold from handover to strike: what was erected, who took it on, every alteration during hire, and the off-hire call and dismantle.
The hire, not the inspections. How often a standing scaffold is inspected, and by whom, is set by the rules where you work and the site — record those on the Scaffold Inspection Record. This sheet is the hire itself: handed over, altered, off-hired, taken down.
Write-on lines: Site / address · Customer / hirer · Job ref · Erected by
Write-on lines: Location on building · Type · Lifts · Length / height · Ties (type & how many) · Loading class agreed · Sheeting / netting / fans · Ladders / stair access · Design drawing ref, if any · Tag / handover cert no. · Handed over on · Handed over by · Received by (name & role) · Signature
Table, 3 rows: Date · Requested by · What was done · Done by · Re-tagged? · Chargeable?
Write-on lines: Off-hire called on · Called by · Taken by (your office) · Hire ends on · Dismantled on · Materials missing or damaged at strike · Counted by · Making good needed · Hirer signature at off-hire · Print name · Scaffolder · Date
On the Scaffold Inspection Record, not here. How often a standing scaffold is inspected and by whom is set by the rules where you work and the site's own arrangements; this sheet is the hire — handed over, altered, off-hired, taken down.
Because the two signatures answer the two questions that end in a dispute: who accepted the scaffold as fit to use on day one, and when the customer stopped paying for it.
Keep a dated inspection history for one scaffold, with findings and the action taken recorded beside each inspection.
Trace a crack, a colour difference or a failed bond back to the batch, the day and the weather, instead of guessing which wall was done when.
Record a day on site while it is happening, because delay, weather and verbal instructions all become arguments later and are trivial to note now.
Know who has what and when it was due back, and record the condition an item was in when it came home rather than discovering it at the next job.
Every sheet, binder, game and puzzle on Upkeep Papers is free to download, with no email and no account. Making them is not free: each one takes days of research, design and checking, and the site costs money to run. If something here saved you time, you can buy us a coffee. It is entirely optional: nothing is locked, and nothing changes if you don’t.
Opens PayPal in a new tab. Any amount, and nothing changes if you would rather not.