Carpentry and Second Fix Sheet
Know at the end of the day which doors are hung, which rooms are finished and what is still snagging, without walking the whole house again.
Trade job forms · TJ-04
A free printable bathroom fitting job sheet — quoted scope against what was fitted, variations initialled, a site-day log and the checks made before sign-off.
2 pages. Choose your paper size — both versions are laid out identically, so neither one gets shrunk to fit.
Print it and write on it
Fill it in type and save
The fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.
Stop the end-of-job argument before it starts, by having every change written and initialled on the day it was agreed.
Bathroom fitters and small building firms running a job with several trades through one room.
2 pages, in this order:
Printed under the title: A bathroom job from strip-out to sign-off: what was agreed, what was fitted, who was on site each day, what was added on the way and what the customer checked before paying.
Write the change on the day. The scope table is the argument-stopper. Fill in the quoted column before the first tile comes off, and write every change in the variation column on the day it is agreed, with the customer's initials beside it.
Write-on lines: Customer · Address · Job ref · Start date · Agreed finish · Lead fitter · Quote ref & date
Table, 11 rows: Element · Quoted — product / spec · Fitted · Variation agreed · Initials
Table, 14 rows: Date · Trade on site · Work done · Materials used · Hours
Signature strip: Fitter · Customer · Date
Because a variation is first a change of scope, and the sheet keeps that separate from the money. Price the changes on your quote or invoice; this sheet is the record that they were agreed.
Then it is not agreed, and that is worth knowing before the work is done rather than after. Write what was discussed and who declined, and go back to the quote.
Know at the end of the day which doors are hung, which rooms are finished and what is still snagging, without walking the whole house again.
Work out what one job actually cost, so the next quote is based on a figure rather than on a feeling about the last one.
Get the customer's signature that the work is done while you are still standing there, with anything outstanding written down rather than remembered differently.
Tie the survey, the treatment and the guarantee together on one page, so a claim years later can be answered from the record and not from memory.
The same subject, with a version you can fill in on screen.
The room, its dimensions and where the soil pipe and water supplies are now.
Every sheet, binder, game and puzzle on Upkeep Papers is free to download, with no email and no account. Making them is not free: each one takes days of research, design and checking, and the site costs money to run. If something here saved you time, you can buy us a coffee. It is entirely optional: nothing is locked, and nothing changes if you don’t.
Opens PayPal in a new tab. Any amount, and nothing changes if you would rather not.