Asbestos Presumed Material Register

A free printable asbestos register template — each presumed material by location, with extent, condition, status and decision, plus a re-inspection log.

First page of the Asbestos Presumed Material Register — Keep one honest list of what is presumed, what has been sampled and what was decided, so nobody drills into something because the register was in someone's head.
Download Free · no sign-up

2 pages. Choose your paper size — both versions are laid out identically, so neither one gets shrunk to fit.

Print it and write on it

Fill it in type and save

The fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.

What this sheet is for

Keep one honest list of what is presumed, what has been sampled and what was decided, so nobody drills into something because the register was in someone's head.

Who it is for

Building owners, managing agents and site managers who have to keep track of materials in a building that may contain asbestos, and contractors who need to read it before they start.

How to use it

  1. Give every material in every location its own row and reference, even where the same product appears in several rooms.
  2. Mark each as presumed, sampled or confirmed, and update the row when a result comes back.
  3. Record the condition and the decision — leave and monitor, seal, remove — with the date it was last looked at.
  4. Log every walk-round and every disturbance in the re-inspection table.
  5. Show it to any contractor before they open a wall, ceiling or floor.

What is on the sheet

2 pages, in this order:

Page 1

Printed under the title: A room-by-room list of materials that are presumed to contain asbestos until someone proves otherwise: where they are, what condition they are in and what has been decided about them.

Presumed means untested. Presuming a material contains asbestos is a management decision, not a test result. Sampling, analysis and any survey are done by whoever your rules say may do them; record the outcome here when it comes back. Who has to keep a register, and for which buildings, is set by the rules where you are.

Write-on lines: Property / building · Address · Register started · Compiled by · Survey report ref (if any) · Person responsible · Last reviewed

Materials — one row per material in each location — status P presumed, S sampled, C confirmed

Table, 11 rows: Ref · Location · Material / product · Extent · Status · Condition · Decision · Reviewed

Page 2

Re-inspections and changes — each time the register is walked, a result comes back or a material is disturbed

Table, 19 rows: Date · By · Refs checked · Change found or work done · Next review

Signature strip: Person responsible · Print name · Date

Questions

Is this a survey?

No. A survey is done by whoever your rules allow to do one and comes with its own report; this register is the working list that sits on top of that, or that you keep while presuming materials until a survey is done. If a report exists, write its reference at the top.

Who has to keep one, and for which buildings?

That depends on the rules where you are, and the sheet does not try to answer it. Check them, and if you are unsure, keeping the register anyway costs nothing.

Related sheets

Contractor and Tradesperson Log

Remember who did what, what it cost, and who was worth calling back — and have a dated record if a dispute ever starts.

PR-05 1 page

Damp Proof Course Installation Record

Tie the survey, the treatment and the guarantee together on one page, so a claim years later can be answered from the record and not from memory.

TJ-10 2 pages

Cable Run and Containment Record

Produce as-built information for the certificate, the client and the next person to open the ceiling, instead of reconstructing it from memory.

TJ-06 2 pages

Job Sheet

Capture a job while you are still standing in it: what was asked for, what was done, what went into it and how long it took.

WT-05 2 pages

Everything here is free

Every sheet, binder, game and puzzle on Upkeep Papers is free to download, with no email and no account. Making them is not free: each one takes days of research, design and checking, and the site costs money to run. If something here saved you time, you can buy us a coffee. It is entirely optional: nothing is locked, and nothing changes if you don’t.

Buy us a coffee

Opens PayPal in a new tab. Any amount, and nothing changes if you would rather not.