Run a job that lasts longer than a day without losing track of what was ordered, what arrived, and what changed after the work started.
Site and construction · SI-05
A free printable daily site diary — who was on site and for how long, deliveries and visitors, and the delays and verbal instructions.
2 pages. Choose your paper size — both versions are laid out identically, so neither one gets shrunk to fit.
Print it and write on it
Fill it in type and save
The fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.
Record a day on site while it is happening, because delay, weather and verbal instructions all become arguments later and are trivial to note now.
Site managers, small builders, self-builders, project managers and anyone running work where time and instructions may be disputed.
The layout is fixed at a size that fits both A4 and US Letter, so the A4 and Letter files are visually identical and print at full size on either. Rows are set at a height that an adult can actually write a date and a few words into with a pen — most printable tables are built in a word processor and never tested with one.
Run a job that lasts longer than a day without losing track of what was ordered, what arrived, and what changed after the work started.
Record a short on-site briefing and, more usefully, what the people listening raised in response to it.
Give every piece of propping, shoring, falsework or edge protection an owner and four dated signatures, so nothing is loaded or struck on an assumption.
We are building this library out steadily. Leave an address and we will send the new sheets as they are finished — nothing else, and no more than one email a week.