Site and construction · SI-05

Site Diary

A free printable daily site diary — who was on site and for how long, deliveries and visitors, and the delays and verbal instructions.

First page of the Site Diary — Record a day on site while it is happening, because delay, weather and verbal instructions all become arguments later and are trivial to note now.
Download Free · no sign-up

2 pages. Choose your paper size — both versions are laid out identically, so neither one gets shrunk to fit.

Print it and write on it

Fill it in type and save

The fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.

What this sheet is for

Record a day on site while it is happening, because delay, weather and verbal instructions all become arguments later and are trivial to note now.

Who it is for

Site managers, small builders, self-builders, project managers and anyone running work where time and instructions may be disputed.

How to use it

  1. Fill it in at the end of each day, on site.
  2. Record the weather. It is the most-cited entry in any delay argument.
  3. Write down verbal instructions and who gave them, the same day.
  4. Note deliveries that did not arrive as well as those that did.
  5. Keep the sheets in date order for the whole job.

What is on the sheet

The layout is fixed at a size that fits both A4 and US Letter, so the A4 and Letter files are visually identical and print at full size on either. Rows are set at a height that an adult can actually write a date and a few words into with a pen — most printable tables are built in a word processor and never tested with one.

Related sheets

Work Order and Materials Record

Run a job that lasts longer than a day without losing track of what was ordered, what arrived, and what changed after the work started.

WT-06 2 pages

Toolbox Talk Record

Record a short on-site briefing and, more usefully, what the people listening raised in response to it.

SI-06 1 page

Temporary Works Register

Give every piece of propping, shoring, falsework or edge protection an owner and four dated signatures, so nothing is loaded or struck on an assumption.

SI-08 1 page