Site and construction · SI-05

Site Diary

A free printable daily site diary — who was on site and for how long, deliveries and visitors, and the delays and verbal instructions.

First page of the Site Diary — Record a day on site while it is happening, because delay, weather and verbal instructions all become arguments later and are trivial to note now.
Download Free · no sign-up

2 pages. Choose your paper size — both versions are laid out identically, so neither one gets shrunk to fit.

Print it and write on it

Fill it in type and save

The fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.

What this sheet is for

Record a day on site while it is happening, because delay, weather and verbal instructions all become arguments later and are trivial to note now.

Who it is for

Site managers, small builders, self-builders, project managers and anyone running work where time and instructions may be disputed.

How to use it

  1. Fill it in at the end of each day, on site.
  2. Record the weather. It is the most-cited entry in any delay argument.
  3. Write down verbal instructions and who gave them, the same day.
  4. Note deliveries that did not arrive as well as those that did.
  5. Keep the sheets in date order for the whole job.

What is on the sheet

2 pages, in this order:

Page 1

Printed under the title: One day on site: who was there, what was done, what the weather did, and what held things up.

Written on the day, or not at all. A site diary is the cheapest evidence there is. Delay, weather, a late delivery and a visit from someone who told you to stop are all arguments later, and all trivial to record on the day.

Write-on lines: Project · Date · Day · Weather · Recorded by

On site today

Table, 5 rows: Company or trade · Number of people · Hours · Working on · Plant on site

Deliveries, visitors and instructions

Table, 4 rows: Time · Who or what · Detail · Signed for or noted by

Page 2

Delays, problems and anything told to you verbally

Ruled lines

Related sheets

Work Order and Materials Record

Run a job that lasts longer than a day without losing track of what was ordered, what arrived, and what changed after the work started.

WT-06 2 pages

Toolbox Talk Record

Record a short on-site briefing and, more usefully, what the people listening raised in response to it.

SI-06 1 page

Temporary Works Register

Give every piece of propping, shoring, falsework or edge protection an owner and four dated signatures, so nothing is loaded or struck on an assumption.

SI-08 1 page

Also in the resources library

The same subject, with a version you can fill in on screen.

Everything here is free

Every sheet, binder, game and puzzle on Upkeep Papers is free to download, with no email and no account. Making them is not free: each one takes days of research, design and checking, and the site costs money to run. If something here saved you time, you can buy us a coffee. It is entirely optional: nothing is locked, and nothing changes if you don’t.

Buy us a coffee

Opens PayPal in a new tab. Any amount, and nothing changes if you would rather not.