Bathroom Fit-Out Job Sheet
Stop the end-of-job argument before it starts, by having every change written and initialled on the day it was agreed.
Trade job forms · TJ-07
A free printable carpentry job sheet — doors hung with their ironmongery, skirting, architrave and fitted items room by room, snags to clear and materials drawn.
2 pages. Choose your paper size — both versions are laid out identically, so neither one gets shrunk to fit.
Print it and write on it
Fill it in type and save
The fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.
Know at the end of the day which doors are hung, which rooms are finished and what is still snagging, without walking the whole house again.
Site carpenters and joiners on second fix, and the site managers who check their work.
2 pages, in this order:
Printed under the title: Second fix carpentry room by room: doors hung, skirting, architrave, ironmongery and fitted items, with what each room still needs before it can be called finished.
The door's own spec applies. Fire door requirements, gaps and the hardware a door has to carry are set by the door's certificate, the specification for the job and the rules where you work. Copy the spec into the sheet; do not rely on the sheet to supply it.
Write-on lines: Customer / site · Job ref · Date · Carpenter
Table, 12 rows: Door · Location · Size & handing · Fire / spec · Ironmongery fitted · Closer / seals · Hung · Snag
Table, 12 rows: Room · Item · Material / profile · Qty / m · Done · Snags to clear
Table, 4 rows: Material · Qty used · Left over · Supplier / note
Signature strip: Carpenter · Customer / site manager · Date
Because those come from the door's own certificate and the job's specification, and differ from door to door. The column is there so you copy the spec across and record that it was met.
It is built around second fix — doors, trims and fitted items. First fix studwork and joists want their own sheet, though the materials table would serve either.
Stop the end-of-job argument before it starts, by having every change written and initialled on the day it was agreed.
Capture a job while you are still standing in it: what was asked for, what was done, what went into it and how long it took.
Work out what one job actually cost, so the next quote is based on a figure rather than on a feeling about the last one.
Get the customer's signature that the work is done while you are still standing there, with anything outstanding written down rather than remembered differently.
The same subject, with a version you can fill in on screen.
The room perimeter from each wall you measure.
Every sheet, binder, game and puzzle on Upkeep Papers is free to download, with no email and no account. Making them is not free: each one takes days of research, design and checking, and the site costs money to run. If something here saved you time, you can buy us a coffee. It is entirely optional: nothing is locked, and nothing changes if you don’t.