EV Charge Point Installation Record
Record the design decisions for one charge point beside the unit they apply to, so the installation can be understood by whoever looks at it next.
Trade job forms · TJ-15
A free printable electrician job card — the work requested, the circuits touched and what was done to each, materials used, and the certificate issued.
One page. Choose your paper size — both versions are laid out identically, so neither one gets shrunk to fit.
Print it and write on it
Fill it in type and save
The fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.
Tie every job to the circuits it touched and the certificate it produced, so the paperwork trail is complete without test results being copied onto a card.
Electricians and small electrical firms doing domestic and light commercial work, and the office that files the cards afterwards.
One page, top to bottom:
Printed under the title: One electrical job on one card: what was asked for, which circuits were touched, what went in and which certificate went out.
Results go on the certificate. Test results are not recorded here — they belong on the certificate or report your scheme has you issue; the card records which one went out and its number. If none was needed under your scheme, say so in the box.
Write-on lines: Customer · Address · Job no. · Date · Work requested / fault reported · Electrician · Time on / off
Table, 4 rows: Circuit ref · Location · Proved dead by · Work done · Device fitted · Cert?
Table, 2 rows: Item · Qty · Item · Qty · Item · Qty
Write-on lines: Certificate / report type · Certificate no. · Notified to · Labels at board?
Signature strip: Customer signature · Print name · Electrician
Because test results belong on the certificate or report your scheme has you issue for that kind of work, in the layout the scheme sets. Copying them onto a job card invites a mismatch between the two. The card records which certificate was issued and its number, which is what the office needs.
Write that in the certificate box, with a word on why, rather than leaving it empty. A blank looks like a missed one; a note says a decision was made. Whether it needed one is set by your scheme and the rules where you work.
Record the design decisions for one charge point beside the unit they apply to, so the installation can be understood by whoever looks at it next.
Capture a job while you are still standing in it: what was asked for, what was done, what went into it and how long it took.
Get the customer's signature that the work is done while you are still standing there, with anything outstanding written down rather than remembered differently.
Write an invoice by hand when you need one, in a layout that leaves room for whatever your country requires rather than assuming a set of fields.
Every sheet, binder, game and puzzle on Upkeep Papers is free to download, with no email and no account. Making them is not free: each one takes days of research, design and checking, and the site costs money to run. If something here saved you time, you can buy us a coffee. It is entirely optional: nothing is locked, and nothing changes if you don’t.
Opens PayPal in a new tab. Any amount, and nothing changes if you would rather not.