Job sheets and work orders · JS-154 · Form

Installation and Fit-Out Job Sheet

Free installation and fit-out job sheet — items installed with serial numbers, snags raised and cleared, labour and materials totalled. PDF, Excel and browser.

First page of the Installation and Fit-Out Job Sheet printable — every item installed, with make, model, serial number and where it went
Download Free · no sign-up

2 pages. The A4 and US Letter files are laid out identically, so neither is shrunk to fit.

Print it and write on it

Fillable PDF type and save

Spreadsheet formulas included

The fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.

Fill it in online

The same sheet, on screen. Totals and figures are worked out as you type, rows can be added or removed, and you can print it or download the completed version as a PDF. Everything stays in your browser — your entries are kept in this browser's own storage on this device, nothing is uploaded, and there is no account.

Who this is for

The sheet that hands an installation over. Every item fitted is listed with its make, model and serial number, every snag raised gets a line and a tick when it is cleared, and the labour and materials total underneath.

Installation and fit-out teams — kitchens, shopfitting, furniture, doors, equipment, AV and signage — and the contract managers who chase the snag list afterwards.

What this helps you track

  • Every item installed, with make, model, serial number and where it went
  • Which items were tested and demonstrated before handover
  • Snags raised at handover, who is to clear them and when
  • Snags cleared, so the outstanding list is always the unticked lines
  • Labour and materials totalled at your own rate

How to use it

  1. Fill in the job number, customer, site, contact and order reference, and name the installers on site.
  2. List each item as it goes in: description, make and model, serial number, location, quantity.
  3. Tick installed when it is fixed and working, and tested when you have demonstrated it to whoever is accepting the job.
  4. Walk round with the customer and write every snag they raise onto the snag table, with who is clearing it and the date agreed.
  5. Enter the labour and materials, read the totals, and have the sheet signed. Tick the snags off as they are cleared and keep the sheet until the list is empty.

Formats

  • Printable PDF (A4 and US Letter)
  • Fillable PDF with form fields
  • Fill in online, saved in your browser
  • Excel / Google Sheets workbook

The printable is laid out inside a box that fits both A4 and US Letter, so the two files are identical and neither one is scaled. The fillable PDF has real form fields. The workbook uses plain formulas only — SUM, IF, COUNTIF and the like — so it opens in Excel, LibreOffice and Google Sheets without anything breaking, and every calculated cell is grey so you can see which figures it worked out.

How to print

Download the A4 or US Letter file to match the paper in your printer, open it in a PDF reader and print at 100% — not "fit to page", which shrinks the writing space. Both files leave a 14 mm margin, which clears the unprintable edge on home printers. To print the online version with your entries in it, use the Print this sheet button, which prints only the sheet and none of the page around it. More on printing.

Questions

Why record serial numbers here?

Because the warranty claim, the service visit and the asset register all need them, and after handover nobody wants to go back and read the labels. Copy them exactly, including any leading letters.

Is this the same as a snagging list?

No. A snagging list is the customer's walk round of a whole property. This is the installer's record of one fit-out: what was installed, what it was, and the snags raised against that work specifically.

What if snags are found after handover?

Add them to the table with the date they were raised. The sheet stays open until every line is ticked, which is usually what a retention or a final payment is waiting on.

Can I use it for a phased fit-out?

Yes — one sheet per phase or per area, with the same job number. Keeping them separate makes the snag list per area much easier to chase.

Related resources

Warranty Repair Job Sheet

The product, its serial number and the date it was bought or installed.

JS-157 Form PDF Excel Online

Handyman Job Sheet

Every task on the customer's list, ticked off as it is done.

JS-153 Form PDF Excel Online

Also in the library

Printable sheets, workbooks and tools on the same subject.

New Build Snagging List

Keep every fault in a new build on one dated sheet, so the record of what was reported and when exists in your handwriting rather than in a builder's inbox.

MB-04 1 page Moving and buying

Asset Register

Record what the business owns rather than what is in the shed: a numbered list with cost and disposal, which is what an insurer or an accountant asks for.

WT-13 1 page Workshop and tools

Job Completion and Sign-Off Form

Get the customer's signature that the work is done while you are still standing there, with anything outstanding written down rather than remembered differently.

IM-14 2 pages Invoicing and money

Everything here is free

Every sheet, binder, game and puzzle on Upkeep Papers is free to download, with no email and no account. Making them is not free: each one takes days of research, design and checking, and the site costs money to run. If something here saved you time, you can buy us a coffee. It is entirely optional: nothing is locked, and nothing changes if you don’t.

Buy us a coffee

Opens PayPal in a new tab. Any amount, and nothing changes if you would rather not.