Fire Alarm Test Log
Record routine alarm tests including which call point was used, so one faulty device does not sit untested for a year.
Premises and facilities checks · PF-11
A free printable sprinkler inspection checklist — a reference block for your system's own figures, then dated checks, readings, defects and actions.
2 pages. Choose your paper size — both versions are laid out identically, so neither one gets shrunk to fit.
Print it and write on it
Fill it in type and save
The fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.
Keep a dated record of routine checks against the figures your own system's documentation specifies, with defects and actions on the same page.
Facilities managers, building owners, caretakers and anyone responsible for a premises with a sprinkler or suppression system.
2 pages, in this order:
Printed under the title: The routine checks on a sprinkler or suppression system, recorded against dates, with defects and what was done about them.
Your system's figures, not ours. No test intervals, pressures, flow figures or pass criteria are printed on this sheet. They are set by the system's designer, its manufacturer, your insurer and the law where the building is — and servicing usually has to be done by a competent person under a specific standard. Get the figures from your own system's documentation and write them in the reference block.
Write-on lines: Building · System type · Installer or maintainer · Contract ref
Table, 5 rows: Item · Figure or setting from the documentation · Where it came from · Checked how often
Ruled lines: System notes, drawings held, and where the documentation lives
Table, 18 rows: Date · Check carried out · Reading · Within the figure above · Defect found · Action and by whom · By
Write-on lines: Isolations during this period · Impairment notified to insurer · Next service due
The sheet prints no intervals. They come from the standard your system was designed and installed to, the manufacturer, your insurer and the law where the building is — and much of the work usually has to be done by a competent person under a specific standard. Get the figures from your own documentation and write them in the reference block.
No. It is a record of the routine checks you carry out between services. Keep it alongside the maintainer's certificates, not instead of them.
Record routine alarm tests including which call point was used, so one faulty device does not sit untested for a year.
Keep a dated history of emergency lighting tests with the failures and repairs recorded beside them, not just a note that a test happened.
Keep a dated record of monthly visual checks, and separate them clearly from the professional servicing that premises usually also need.
Every sheet, binder, game and puzzle on Upkeep Papers is free to download, with no email and no account. Making them is not free: each one takes days of research, design and checking, and the site costs money to run. If something here saved you time, you can buy us a coffee. It is entirely optional: nothing is locked, and nothing changes if you don’t.
Opens PayPal in a new tab. Any amount, and nothing changes if you would rather not.