Everything here is free. Making it takes time and money. Everything here is free.

Buy us a coffee

Outdoor pursuits · OP-21

Auto Belay Inspection Log

A free printable auto belay inspection log: each unit with serial and recertification date, periodic checks, and a daily visual check line.

First page of the Auto Belay Inspection Log — Take an auto belay with worn webbing or an expired label off the wall the day it is found. Every unit's checks are on one dated record.
Download Free · no sign-up

2 pages. Choose your paper size — both versions are laid out identically, so neither one gets shrunk to fit.

Print it and write on it

Fill it in type and save

The fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.

What this sheet is for

Take an auto belay with worn webbing or an expired label off the wall the day it is found. Every unit's checks are on one dated record.

Who it is for

Climbing walls, leisure centres, schools and activity centres with auto belays.

How to use it

  1. List each unit once, numbered 1 to 6, with its serial and the recertification due date from its label.
  2. Do the daily visual check before opening and write a line on page two.
  3. Do the periodic checks as often as the maker's manual says, one line per unit.
  4. Take a unit out of use as soon as a check fails, and write why and what was done.

What is on the sheet

2 pages, in this order:

Page 1

Printed under the title: Each auto belay on the wall listed with its serial and recertification date, then the periodic checks unit by unit, and a daily line for the visual check. The maker's manual sets how; this sheet records it.

Write-on lines: Centre or wall · Responsible person · Manual version used

Units — the numbers 1 to 6 are used on both pages

Table, 6 rows: Unit · Position on the wall · Make & model · Serial · In service · Recertified · Due · Karabiner

Periodic checks — as often as the manual says; tick if right, X if not

Also printed: Body and labels · Karabiner · Webbing

Table, 7 rows: Date · Unit · Casing · Labels · Cert · Gate · Swivel · Webbing · Retracts · Result · Action · By

Page 2

Daily checks — webbing, karabiner and landing zone: tick if right, X if not

Also printed: Unit, numbered as on page one

Table, 20 rows: Date · 1 · 2 · 3 · 4 · 5 · 6 · Taken out of use · By

Ruled lines: Notes: anything reported by climbers or staff

Questions

How often must an auto belay be checked and recertified?

The sheet does not say, because the maker's manual sets the daily, periodic and recertification checks for each model. Follow the manual for your units, and use this sheet to show they were done.

What if the wall has more than six units?

Use a second copy for units 7 to 12, and write the unit numbers on it. Keeping six to a sheet leaves the columns wide enough to write in.

Related sheets

Climbing Rope Log

Retire a rope on its history, not on how it looks. Every day out, every fall held and every inspection is written against the one rope.

OP-19 2 pages

Climbing Session and Route Log

Build a record of what you have actually climbed and how, so progress shows up as routes on paper rather than as a feeling about how the year went.

OP-06 1 page

Everything here is free

Every sheet, binder, game and puzzle on Upkeep Papers is free to download, with no email and no account. Making them is not free: each one takes days of research, design and checking, and the site costs money to run. If something here saved you time, you can buy us a coffee. It is entirely optional: nothing is locked, and nothing changes if you don’t.

Buy us a coffee

Opens PayPal in a new tab. Any amount, and nothing changes if you would rather not.