Renovation Approvals and Permissions Record
Each application, notice or agreement and who it went to.
Renovation and DIY Projects · RD-1073 · Record
Free pre-renovation hazard record: what the work will disturb, tests for lead paint or asbestos, results, and how each item will be handled. PDF and browser.
One page. The A4 and US Letter files are laid out identically, so neither is shrunk to fit.
Print it and write on it
Fillable PDF type and save
Or no download needed
Fill it in onlineThe fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.
The same sheet, on screen. Tick, type, add or remove rows, then print it or download the completed version as a PDF. Everything stays in your browser — your entries are kept in this browser's own storage on this device, nothing is uploaded, and there is no account.
Check what the work will disturb before it starts. Each surface or material to be sanded, cut, stripped or removed gets a line for the hazard suspected, who tested it, the result and your decision; a checklist covers the set-up agreed with the contractor.
Owners of older homes planning to strip paint, remove textured ceilings, lift old floor tiles or take out pipe lagging, and anyone who wants a clear record of what was tested before a contractor starts.
The printable is laid out inside a box that fits both A4 and US Letter, so the two files are identical and neither one is scaled. The fillable PDF has real form fields. The online version keeps what you enter in your own browser and builds the completed PDF on your device.
Download the A4 or US Letter file to match the paper in your printer, open it in a PDF reader and print at 100% — not "fit to page", which shrinks the writing space. Both files leave a 14 mm margin, which clears the unprintable edge on home printers. To print the online version with your entries in it, use the Print this sheet button, which prints only the sheet and none of the page around it. More on printing.
You cannot tell by looking. The age of the home and its materials are a starting point, but only testing by a qualified person or an accredited laboratory gives an answer. Check the guidance where you are on when testing is advised.
Home test kits exist for some hazards, but how reliable they are varies, and the rules on who may sample materials such as asbestos differ by country. Record who tested and how, and check the rules where you are before disturbing anything.
Leave means the work is planned around it; professional means a suitably qualified contractor does that part; agreed method means a way of working settled in advance. Which applies is for you and your advisers, not this sheet.
Health guidance on lead and dust often singles out young children and pregnancy. Writing down who will be living there lets you and the contractor plan around them; questions about health are for a doctor.
Each application, notice or agreement and who it went to.
The checks made on each firm, and where and when you made them.
Every piece of work, numbered, so quotes and questions can refer to it.
Printable sheets, workbooks and tools on the same subject.
Keep one honest list of what is presumed, what has been sampled and what was decided, so nobody drills into something because the register was in someone's head.
Record a risk assessment you have carried out yourself, in a layout that captures the part people forget: who is doing the further action, by when, and when it gets reviewed.
Every sheet, binder, game and puzzle on Upkeep Papers is free to download, with no email and no account. Making them is not free: each one takes days of research, design and checking, and the site costs money to run. If something here saved you time, you can buy us a coffee. It is entirely optional: nothing is locked, and nothing changes if you don’t.
Opens PayPal in a new tab. Any amount, and nothing changes if you would rather not.