Everything here is free. Making it takes time and money. Everything here is free.

Buy us a coffee

Renovation and DIY Projects · RD-793 · Budget

Garden Landscaping Budget by Zone

Free garden landscaping budget split by zone — materials, labour and plants planned against actual, with a phase per zone and variance. PDF, Excel, browser.

First page of the Garden Landscaping Budget by Zone printable — what each zone of the garden is expected to cost in materials, labour and plants
Download Free · no sign-up

One page. The A4 and US Letter files are laid out identically, so neither is shrunk to fit.

Print it and write on it

Fillable PDF type and save

Spreadsheet formulas included

The fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.

Fill it in online

The same sheet, on screen. Totals and figures are worked out as you type, rows can be added or removed, and you can print it or download the completed version as a PDF. Everything stays in your browser — your entries are kept in this browser's own storage on this device, nothing is uploaded, and there is no account.

Who this is for

A garden budget you can build one zone at a time. Each area gets planned and actual figures for materials, labour and plants, and the phase you will do it in.

Homeowners planning a new garden or a redesign, especially those spreading the work over more than one season or weighing which area to tackle first.

What this helps you track

  • What each zone of the garden is expected to cost in materials, labour and plants
  • What each zone actually cost once the work is done
  • Which zones are running over or under your own figures
  • How the spend splits across the phases you plan to do the work in
  • How the whole project compares with the overall budget you set

How to use it

  1. Write the address, the garden's dimensions, the designer or contractor and your overall budget in the header.
  2. Keep the zone names that fit your garden, rename the rest and add any missing areas.
  3. Enter planned figures for materials, labour and plants from your own quotes or shopping lists, then the actual figures as bills come in.
  4. Give each zone a phase number for the stage you will tackle it in, so the work can be spread over time.
  5. Zone totals and the project variance are worked out in the browser and the workbook; sort or filter the workbook by phase to cost each stage.
  6. Check the summary against your overall budget before committing to the next phase.

Formats

  • Printable PDF (A4 and US Letter)
  • Fillable PDF with form fields
  • Fill in online, saved in your browser
  • Excel / Google Sheets workbook

The printable is laid out inside a box that fits both A4 and US Letter, so the two files are identical and neither one is scaled. The fillable PDF has real form fields. The workbook uses plain formulas only — SUM, IF, COUNTIF and the like — so it opens in Excel, LibreOffice and Google Sheets without anything breaking, and every calculated cell is grey so you can see which figures it worked out.

How to print

Download the A4 or US Letter file to match the paper in your printer, open it in a PDF reader and print at 100% — not "fit to page", which shrinks the writing space. Both files leave a 14 mm margin, which clears the unprintable edge on home printers. To print the online version with your entries in it, use the Print this sheet button, which prints only the sheet and none of the page around it. More on printing.

Questions

Why split the budget by zone?

Because landscaping is usually done area by area, and often over more than one year. Seeing the patio, lawn and beds separately makes it easier to decide what to do now, what to leave and where a cheaper choice would make the most difference.

Where do the planned figures come from?

From your own quotes, supplier prices and plant lists. The sheet supplies no costs per square metre or plant prices, because they vary with the site, the materials and where you buy.

What does a negative variance mean?

Variance is planned minus actual, so a negative figure means the work has cost more than you planned. Compare each zone's plan and actual columns to see where the difference came from.

How do I record work I do myself?

Leave the labour columns at zero for that zone, or enter a figure for hired equipment or help you pay for. Note which zones are your own work so any comparison with a contractor quote stays fair.

Related resources

Also in the library

Printable sheets, workbooks and tools on the same subject.

Fencing and Gate Installation Record

Get the boundary conversation written down and signed before the first post goes in, then record exactly what was built where.

TJ-17 1 page Trade job forms

Everything here is free

Every sheet, binder, game and puzzle on Upkeep Papers is free to download, with no email and no account. Making them is not free: each one takes days of research, design and checking, and the site costs money to run. If something here saved you time, you can buy us a coffee. It is entirely optional: nothing is locked, and nothing changes if you don’t.

Buy us a coffee

Opens PayPal in a new tab. Any amount, and nothing changes if you would rather not.