Home Improvement Project Planner
The stages of the job in order, with start and finish dates and how long each took.
Home and property records · HP-406 · Checklist
Free snagging and punch list — every defect by room with the trade, the date raised, a fix date and the outstanding count. PDF, Excel and browser.
2 pages. The A4 and US Letter files are laid out identically, so neither is shrunk to fit.
Print it and write on it
Fillable PDF type and save
Spreadsheet formulas included
The fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.
The same sheet, on screen. Totals and figures are worked out as you type, rows can be added or removed, and you can print it or download the completed version as a PDF. Everything stays in your browser — your entries are kept in this browser's own storage on this device, nothing is uploaded, and there is no account.
One numbered line per defect, until there are none left. Each snag gets a room, a description, the trade responsible and a date raised, and the sheet counts how many are still open so the list closes rather than drifts.
Buyers walking a new build before completion, anyone at the end of a renovation with a builder still on site, and landlords or tenants listing what needs putting right before keys change hands.
The printable is laid out inside a box that fits both A4 and US Letter, so the two files are identical and neither one is scaled. The fillable PDF has real form fields. The workbook uses plain formulas only — SUM, IF, COUNTIF and the like — so it opens in Excel, LibreOffice and Google Sheets without anything breaking, and every calculated cell is grey so you can see which figures it worked out.
Download the A4 or US Letter file to match the paper in your printer, open it in a PDF reader and print at 100% — not "fit to page", which shrinks the writing space. Both files leave a 14 mm margin, which clears the unprintable edge on home printers. To print the online version with your entries in it, use the Print this sheet button, which prints only the sheet and none of the page around it. More on printing.
Nothing but the word. Snagging is the British term and punch list the American one; both mean the list of small defects left at the end of a job. This sheet works for either.
No. What is acceptable depends on the contract, the specification and the standards your builder works to, and those differ. The sheet records what you found and what was agreed about it.
Yes. Many people use it between tenancies for the list of small repairs, with the trade column naming a handyman, a contractor or the landlord.
Keep the original number and write the second date in the note column rather than adding a new line. A repeated snag is easier to argue about when it has one number and a history.
The stages of the job in order, with start and finish dates and how long each took.
Every job done to the house, dated, with who did it.
The policy, claim and loss adjuster details in one place, ready to quote.
Printable sheets, workbooks and tools on the same subject.
Keep every fault in a new build on one dated sheet, so the record of what was reported and when exists in your handwriting rather than in a builder's inbox.
Get a defect reported in writing with a date on the report, the response and the completion, so it can be chased rather than remembered.
Every sheet, binder, game and puzzle on Upkeep Papers is free to download, with no email and no account. Making them is not free: each one takes days of research, design and checking, and the site costs money to run. If something here saved you time, you can buy us a coffee. It is entirely optional: nothing is locked, and nothing changes if you don’t.
Opens PayPal in a new tab. Any amount, and nothing changes if you would rather not.