Snagging and Punch List

Free snagging and punch list — every defect by room with the trade, the date raised, a fix date and the outstanding count. PDF, Excel and browser.

First page of the Snagging and Punch List printable — every defect written down once, numbered, so nothing is argued about twice
Download Free · no sign-up

2 pages. The A4 and US Letter files are laid out identically, so neither is shrunk to fit.

Print it and write on it

Fillable PDF type and save

Spreadsheet formulas included

The fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.

Fill it in online

The same sheet, on screen. Totals and figures are worked out as you type, rows can be added or removed, and you can print it or download the completed version as a PDF. Everything stays in your browser — your entries are kept in this browser's own storage on this device, nothing is uploaded, and there is no account.

Who this is for

One numbered line per defect, until there are none left. Each snag gets a room, a description, the trade responsible and a date raised, and the sheet counts how many are still open so the list closes rather than drifts.

Buyers walking a new build before completion, anyone at the end of a renovation with a builder still on site, and landlords or tenants listing what needs putting right before keys change hands.

What this helps you track

  • Every defect written down once, numbered, so nothing is argued about twice
  • The room and the exact spot, which is what the trade needs to find it
  • Who is responsible for each item and when it was first raised
  • Which snags are fixed, which are outstanding and how many are left

How to use it

  1. Write the property, who is inspecting and the date at the top, then walk the rooms in a fixed order so none is missed.
  2. Use the walk-round list as a prompt, ticking each area once you have looked at it properly.
  3. Number each defect as you find it and describe it plainly — 'hairline crack, left of window reveal' beats 'damage'.
  4. Name the trade responsible and the date you raised it, then agree a date for the fix and write that in.
  5. Tick the fixed box and write the date only once you have seen the work, not when you were told it was done.
  6. The browser and spreadsheet versions count what is outstanding; on paper, count the unticked lines and carry them onto a fresh sheet.

Formats

  • Printable PDF (A4 and US Letter)
  • Fillable PDF with form fields
  • Fill in online, saved in your browser
  • Excel / Google Sheets workbook

The printable is laid out inside a box that fits both A4 and US Letter, so the two files are identical and neither one is scaled. The fillable PDF has real form fields. The workbook uses plain formulas only — SUM, IF, COUNTIF and the like — so it opens in Excel, LibreOffice and Google Sheets without anything breaking, and every calculated cell is grey so you can see which figures it worked out.

How to print

Download the A4 or US Letter file to match the paper in your printer, open it in a PDF reader and print at 100% — not "fit to page", which shrinks the writing space. Both files leave a 14 mm margin, which clears the unprintable edge on home printers. To print the online version with your entries in it, use the Print this sheet button, which prints only the sheet and none of the page around it. More on printing.

Questions

What is the difference between a snag and a punch list?

Nothing but the word. Snagging is the British term and punch list the American one; both mean the list of small defects left at the end of a job. This sheet works for either.

Does it say what counts as a defect?

No. What is acceptable depends on the contract, the specification and the standards your builder works to, and those differ. The sheet records what you found and what was agreed about it.

Can I use it for a rental inspection?

Yes. Many people use it between tenancies for the list of small repairs, with the trade column naming a handyman, a contractor or the landlord.

How do I show the same snag was raised twice?

Keep the original number and write the second date in the note column rather than adding a new line. A repeated snag is easier to argue about when it has one number and a history.

Related resources

Also in the library

Printable sheets, workbooks and tools on the same subject.

New Build Snagging List

Keep every fault in a new build on one dated sheet, so the record of what was reported and when exists in your handwriting rather than in a builder's inbox.

MB-04 1 page Moving and buying

Building Defect Report Form

Get a defect reported in writing with a date on the report, the response and the completion, so it can be chased rather than remembered.

PF-08 1 page Premises and facilities checks

Everything here is free

Every sheet, binder, game and puzzle on Upkeep Papers is free to download, with no email and no account. Making them is not free: each one takes days of research, design and checking, and the site costs money to run. If something here saved you time, you can buy us a coffee. It is entirely optional: nothing is locked, and nothing changes if you don’t.

Buy us a coffee

Opens PayPal in a new tab. Any amount, and nothing changes if you would rather not.