New Build Extras and Upgrades Cost Sheet
The plot, base price and the date choices must be in.
Property Buying and Selling · PB-562 · Record
Free new build progress record: reservation details, each build stage as the developer reports it, and dated promises made. Printable PDF and browser.
One page. The A4 and US Letter files are laid out identically, so neither is shrunk to fit.
Print it and write on it
Fillable PDF type and save
Or no download needed
Fill it in onlineThe fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.
The same sheet, on screen. Tick, type, add or remove rows, then print it or download the completed version as a PDF. Everything stays in your browser — your entries are kept in this browser's own storage on this device, nothing is uploaded, and there is no account.
A buyer's own record of a new-build purchase. Reservation details at the top, each build stage logged as the developer reports it, and every promise dated.
People who have reserved a home on a new development and are waiting for it to be built, often for months, with updates coming from sales staff and site managers.
The printable is laid out inside a box that fits both A4 and US Letter, so the two files are identical and neither one is scaled. The fillable PDF has real form fields. The online version keeps what you enter in your own browser and builds the completed PDF on your device.
Download the A4 or US Letter file to match the paper in your printer, open it in a PDF reader and print at 100% — not "fit to page", which shrinks the writing space. Both files leave a 14 mm margin, which clears the unprintable edge on home printers. To print the online version with your entries in it, use the Print this sheet button, which prints only the sheet and none of the page around it. More on printing.
Anything beyond being told: dated photographs from the developer, a site visit, a written update or a warranty inspection report. Note which you had, since a verbal update is harder to rely on later.
That depends on the reservation agreement you signed and the rules where you are. Read the agreement and ask your solicitor or conveyancer; the record only notes what you paid and when.
Completion dates, upgrades and fixes are often mentioned in passing over months. A dated list of who said what makes it easier to follow up and to show your solicitor if something goes wrong.
It is built for the time before completion. For defects found after you move in, a separate snagging list works better, with one line per fault.
The plot, base price and the date choices must be in.
Your solicitor, their reference and the other side's solicitor in one place.
Solicitor, agent and removals contacts where you can reach them.
Printable sheets, workbooks and tools on the same subject.
Keep every fault in a new build on one dated sheet, so the record of what was reported and when exists in your handwriting rather than in a builder's inbox.
Have a prompt list to work through with whoever is handling the transaction, so documents are found before they are asked for rather than afterwards.
Every sheet, binder, game and puzzle on Upkeep Papers is free to download, with no email and no account. Making them is not free: each one takes days of research, design and checking, and the site costs money to run. If something here saved you time, you can buy us a coffee. It is entirely optional: nothing is locked, and nothing changes if you don’t.
Opens PayPal in a new tab. Any amount, and nothing changes if you would rather not.