Major Works Consultation Record
Each stage of the consultation, with the notice date and response deadline.
Shared Buildings and Residents · NB-854 · Form
Free contractor quote comparison for communal works: up to four quotes side by side and the cost to each flat. PDF, Excel and browser.
2 pages. The A4 and US Letter files are laid out identically, so neither is shrunk to fit.
Print it and write on it
Fillable PDF type and save
Spreadsheet formulas included
The fillable versions have real form fields — open them in any PDF reader, type into them and save. Printing help.
The same sheet, on screen. Totals and figures are worked out as you type, rows can be added or removed, and you can print it or download the completed version as a PDF. Everything stays in your browser — your entries are kept in this browser's own storage on this device, nothing is uploaded, and there is no account.
Up to four quotes for the same job, side by side. Break each quote down line by line, record the terms each contractor offers, then see what every flat would pay under each quote using the shares from the leases.
Directors, freeholders and residents' groups getting quotes for communal repairs or improvements who need to show every leaseholder the options and what each would cost them.
The printable is laid out inside a box that fits both A4 and US Letter, so the two files are identical and neither one is scaled. The fillable PDF has real form fields. The workbook uses plain formulas only — SUM, IF, COUNTIF and the like — so it opens in Excel, LibreOffice and Google Sheets without anything breaking, and every calculated cell is grey so you can see which figures it worked out.
Download the A4 or US Letter file to match the paper in your printer, open it in a PDF reader and print at 100% — not "fit to page", which shrinks the writing space. Both files leave a 14 mm margin, which clears the unprintable edge on home printers. To print the online version with your entries in it, use the Print this sheet button, which prints only the sheet and none of the page around it. More on printing.
Totals can hide differences in scope: one contractor may include scaffolding or waste removal that another has left out. Lining the items up shows whether the quotes are for the same job.
Not necessarily. Scope, start date, warranty, insurance and references all matter, which is why they sit on the same sheet. Record the reasons for the choice so leaseholders can see them.
For larger works there are often formal consultation steps, and they differ by country. Check the rules where you are and your leases; a consultation record can sit alongside this sheet.
Enter the share that applies to this kind of cost under the lease. Some leases split roof or lift costs differently from general costs.
Each stage of the consultation, with the notice date and response deadline.
Each cost heading with last year's actual and this year's budget.
Every communal fault reported, with where it was and who fixed it.
Printable sheets, workbooks and tools on the same subject.
See where three quotes actually differ, which is usually in what has been left out rather than in the number at the bottom.
Every sheet, binder, game and puzzle on Upkeep Papers is free to download, with no email and no account. Making them is not free: each one takes days of research, design and checking, and the site costs money to run. If something here saved you time, you can buy us a coffee. It is entirely optional: nothing is locked, and nothing changes if you don’t.
Opens PayPal in a new tab. Any amount, and nothing changes if you would rather not.